Building a home is a significant investment. Understanding the cost breakdown can help you budget effectively and make informed decisions. Here’s a look at the estimated costs for a G+2 Building, considering the given percentages:
1. Designing (0.63%): This covers architectural plans, structural designs, and other necessary drawings.
2. Civil Labour (21.13%): This includes labor costs for excavation, foundation work, masonry, and concrete work.
3. Civil Material (31.69%): Costs of materials like cement, P sand /M sand, Red bricks, aggregates, and steel
4. Miscellaneous (0.29%): Covers minor expenses not included in other categories Like Drinking water, Workers Toilet, Site Arrangements.
5. Electrical Labour (1.27%): Labor costs for electrical wiring, installation of fixtures, and other electrical work.
6. Electrical Materials (2.96%): Costs of wires, cables, switches, sockets, and other electrical components.
7. Plumbing Materials (3.38%): Costs of pipes, fittings, fixtures (taps, showers), and other plumbing components.
8. Plumbing Labour (1.27%): Labor costs for plumbing installation, including piping, drainage, and fixture installation.
9. Paint Materials (1.69%): Costs of paints, primers, Patti and other painting materials.
10. Paint Labour (2.96%): Labor costs for painting the interior and exterior of the house.
11. Doors and Carpenter(4.65%): Costs of Teak doors and Room Wooden Flush doors, Toilet Wpc (Wood polimer cast) doors (wood, aluminum, or other materials) with Labor costs for carpentry work.
12. Windows (UPVC) (2.54%): Long Window and Bedroom Windows installation and other materials.
13. Grills, Gate & Handrails (4.65%): Costs of metalwork for Safety grills, Main Gates, and Staircase and Balcony handrails.
14. Flooring- Tiles & Granite Materials (5.07%): Costs of Floor and wall Tiles, Kitchen Granite and other flooring materials.
15. Tiles Work Labour (2.11%): Labor costs for tile laying and flooring installation.
16. Waterproofing (0.63%): Costs of waterproofing materials and labor for waterproofing areas like bathrooms, balconies, terraces and wet areas.
17. Supervision & Consultation (13%): Costs of project management, site supervision, and consultations with engineers and architects.
Important Notes:
- These are estimated costs. However, it’s crucial to understand that they can vary significantly. Location, material choices, labor costs, and other factors all play a role in the final expens
- This Cost breakdown does not include costs for furniture, appliances, landscaping, or any unforeseen expenses.
- Always consult with local builders, contractors, and architects for accurate and personalized cost estimates.
This breakdown provides a general idea of the potential costs involved in G+2 Building. By carefully considering these factors and working with experienced professionals, you can plan and budget for your construction project effectively.
Manikandan vadivel
Hi I’m Manikandan, your house plan and architecture is very nice. I’m from Nagapattinam 32 × 22 land area I’m going build my dream house, it’s west face land can you please tell me how to plan for this building plan
April 2, 2025eettitech@gmail.com
Dear Manikandan’s Vadivel Sir,
Thanks for your valuable interest towards us.
We are happy to support you.
Kindly message us on WhatsApp in the below link
https://wa.me/+919940471936
Thanks and Regards
April 3, 2025Box Black Internationals